Discussion on Construction Plane Control Measurement Method in Long Tunnel of High-Speed Railway

Authors

  • Mingming Fu Hebei University of Architecture, Zhangjiazhou, Hebei, China

DOI:

https://doi.org/10.53469/jtpes.2023.03(04).03

Keywords:

high-speed railway long tunnel, Plane control survey, Cross double conductor, Data processing

Abstract

Tunnel construction plane control is the core of high-speed railway tunnel construction, and its quality directly affects the accuracy and security of tunnel technology. With the advent of GPS ink-jet technology and the emergence of precision electronic level, the quality requirements of tunnel plane control are becoming higher and higher. In this paper, taking Zheng-Wan high-speed railway as an example, the construction plane control measurement method in the long tunnel of high-speed railway is discussed.

Downloads

Published

2023-04-30

How to Cite

Fu, M. (2023). Discussion on Construction Plane Control Measurement Method in Long Tunnel of High-Speed Railway. Journal of Theory and Practice of Engineering Science, 3(4), 8–11. https://doi.org/10.53469/jtpes.2023.03(04).03