Effectively Implement Project Cost Control and Cost Management
DOI:
https://doi.org/10.53469/jtpes.2023.03(09).05Keywords:
Effective implementation, Engineering cost control, Cost managementAbstract
In the scope of a project, in order to complete the project construction task and all the expenditure, called the project cost, for the project itself, the level of the project cost, directly affects the economic benefits of the project, for the relevant enterprises, the implementation of project cost control is an important component of the project management content, To a large extent, it reflects the management level of the enterprise itself and affects the core competitiveness of the enterprise. In the case of increasingly fierce market competition in the engineering industry, how to effectively implement the project cost control and cost management has gradually become an important part of the relevant enterprises' attention and research content. It is of practical significance to analyze and discuss the effective measures of the project cost control.
References
Zhang Congli. Application Research of BIM Technology in Engineering Cost Management [J]. Green Environmental protection Building Materials,2020(04):198-199.
Zhou Jinfeng, Wu Qian. Reasonable Control in Each Stage of Construction Cost Management [J]. Building Materials and Decoration,2020(10):193-194.
Su Chen. How to Effectively Implement Project Cost Control and Cost Management [J]. Building Materials and Decoration,2016(46):157-158.
ZHANG Hongliang. Discussion on How to Effectively Implement Project Cost Control and Cost Management [J]. Building Materials and Decoration (Mid-day),2008(07):344-345.
Qinqin Li,Wei Wang,Canjun Lu,2015.Study on Program of Internal Function Layout of Modern Logistic Delivery Center, Railway Transport and Economy.37(8), pp.22-28.
Hui Li, Guowen Huang, Ershi Qi,2014.Dynamic Facility Layout Problem Systems Based on Hybrid Ant Colony Optimization Algorithm, Journal of Industrial Engineering and Engineering Management. 01(28), pp.110-118.
Xin Shi, 2014. Research on Production Facility Planning Based on SLP, Machine Design & Research.01(30), pp.68-71.
Yifei Shi ,2014. Study on Planning and Design of Logistics Centers Based on Improved SLP Approach, Logistics Technology.,07(33), pp.189-191
CHENG S, LU H, Coordination of Supply Chain under Disruptions with Quantity Discount Contract, Journal of Logistics Engineering and Management, no 7. pp. 119-121, (2015).
WU Z.H,CHEN H, ZHAO Q.Supply Chain Coordination Model under Asymmetric information and Disruptions,Journal of Systems & Management, no.24(1),pp.91-97,( 2015).
WU X.H, YAO X, YIN X.J,Research Review of Supply Chain Coordination by Contract under Emergency, Journal of Science and Technology Management Research, Vol.35; No.334(12), pp.188-193,(2015)
ZHU X.Q,Impact of Emergencies on Supply Chains, Logistics Engineering and Management, no.36(4), pp. 61-64, (2014)
Zhang J.Y,Research on Prevention Strategies of Supply Chain Risk Basedon the Emergency Events.Beijing Jiaotong University of master's degree thesis printed wersion,(2013).
Wu W. The Effect of Emergencies-based Supply Chain Risk on Firm Performance, Beijing Jiaotong University of master's degree thesis printed wersion,(2014)
Guo L,Zhou R.H,Study on Risk Analysis and Emergency Strategy of Outbreaking Events in Tourist Product Supply Chain,Journal of Logistics Technology, no.32(7),pp. 211-213, (2013).
Qiao F,An Analysis of Risk Management in Retail Supply Chain - A Case Study of Mei Te Hao,China Economist,no. 4,pp.52-53,(2014).
Li X.M ,Study on Coordination of Multiple Retailers in Responding to Supply Chain Outbreak Incidents,Journal of Logistics Technology,no.11,pp.276-278,(2014).
Li M, Hu H, Analysis and Emergency Countermeasures of Outbreak Events in Tourism Product Supply Chains,ournal of Logistics Technology,no.23,pp.385-386,(2014).
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 Xiufang Sun
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.